    To get a route select the input data. Then press the button "Get transportation cost" to generate it, you can download the results in csv or kml format required fields*

    Details

    Right click on the power plant you want to supply

    Welcome
    Welcome start by selecting the raw material you need and then click on the "Load raw material and collection centers" button."
    Raw material
    Perfect!
    Notice on the left side colors are shown on the map. Each color has an associated value with respect to the following scale.
      You can draw an area of ​​interest on the map.
      use the button in the tools menu select the area of ​​interest using the selector tool or if you prefer, use the button to upload a KML file. Press the "Select Supply area" button to continue.
      *Remember that if you do not select collection centers, you will not be able to calculate transport routes.
      Selection of sustainability criteria
      In this section you can “choose” filters for the selected supply area. Don't worry, you can use default values. Once you choose press the continue button and the system will calculate statistics based on the area of selection and the criteria you chose. Remember that you can return whenever you want to the previous section (using the mouse scroll).
      Filter total supply according to technical and sustainability criteria
      • 1.- Excluding some particular class of cover/land use:
      • 2.- Excluding natural protected areas:
      • 3.- Excluding slopes greater than:
      • 4.- Accessibility within an area of:
      Huatulco
      Details of the selected area
      Below is the data of the selected area, the next step is to "convert the raw material (biomass) into electrical or thermal energy", for this we can use the button 'Convert biomass into thermal or electrical energy'.
      • selected area: hectares
      • The selected area is very large, random samples were taken.
      • vegetated area: hectares
      • usable biomass: tDM/year
      • energy equivalent:
      • Average: tDM/ha/year
      • Maximum value: tDM/ha/year
      • Minimum value: tDM/ha/year
      • Standard deviation: tDM/ha/year


      transformation chain
      On the left side there is a transformation chain associated with the selected raw material. To continue, select each item in order, from left to right. You can choose one path at a time, when you reach the end element the panel will be displayed so you can select a power plant (demand).
      To modify the values ​​of the coefficients of each element of the chain, first click on the element and then click on the coefficient that you want to modify. Don't forget that if you modify a coefficient, you will have to follow through the path again from the element of which you modified the coefficient.
      Selection of demand sector and sustainability criteria
      Selection of demand sector and sustainability criteria
      Click on "Load demand sectors" to see the available plants or mills. Click on the power plant to show details. If you want to select a power plant to calculate a transport route, right click on it.


      Transportation cost analysis
      Resource type:
      Humidity: %
      Resource cost ($/tDM):
      Type of transport:
      Performance (l/Km):
      Load (t):
      Fuel cost: $
      Total biomass of the collection center (tDM):
      Route 1
      Transportation cost to the collection center($/tDM):
      toll road
      Total distance from the collection center to the point of demand (km):
      Corrected distance from the collection center to the point of demand (km):
      Cost from the collection center to the point of demand ($/tDM):
      total unit cost ($/t):
      Cost per trip ($/trip):
      Total cost ($):
      toll free route
      Total distance from the collection center to the point of demand (km):
      Corrected distance from the collection center to the point of demand (km):
      Cost of the collection center to the point of demand($/tDM):
      total unit cost ($/t):
      Cost per trip ($/trip):
      Total cost ($):
      selection by polygon

      Rectangle
      Polygon
      Circle

      Selection by Administrative divisions


      State:

      Municipality:




      Selection by radius

      meters
      satelite
      Land
      Hybrid
      Roads

      brightness

      100

      Contrast

      100

      Saturation

      1

      Grayscale

      0

      invert

      0